-

The hidden cost of relying on fabricators for temporary works shop drawings
-

3D scanning critical to success of crane lifts near active railroad
-

Early construction as-builts identify discrepancies: Responding to differing site conditions at a quay wall
-

Siphon thrust block constructability through 3D modeling
-

Field Shop Drawings prevent railroad construction delays and expedite review
-

Crane configuration considerations
